Explore verified case studies showcasing architectural lighting, industrial distribution systems, and luxury automation.
Complete electrical installation and Cat6a network wiring for a 5-story financial corporate headquarters.
Client Challenge
Fast-track electrical and data distribution for 450 desks with zero building disruption during tenant transitions.
Engineering Solution
Installed dual busbar underfloor distributions, intelligent LED lighting controllers, and Cat6a structured networks backed by dual UPS units.
Verified Results
Completed project 10 days ahead of schedule. Post-occupancy energy audits showed a 32% reduction in lighting expenses.
Industrial power design and high-volume distribution board upgrade for a 120,000 sq ft logistics depot.
Client Challenge
Legacy switchgear failing under increased heating and ventilation loads from expanded automated picking lines.
Engineering Solution
Designed and built a custom 1600A main distribution switchboard panel, complete with automatic mains failure (AMF) transfer links.
Verified Results
Restored full supply reliability with zero thermal outages. Tripping instances eliminated completely.
Full architectural rewire, luxury lighting layout, and integration of a Crestron smart home system.
Client Challenge
Modernizing electrical systems in a Grade II listed property without altering historical decorative paneling.
Engineering Solution
Utilized specialized micro-conduits, custom metal-chased wall paths, and wireless dimmer units to limit wall penetrations.
Verified Results
Delivered a completely modernized, smart-enabled system while preserving 100% of the building’s heritage features.
High-specification architectural display lighting and LED control layout for a West End fashion store.
Client Challenge
Older metal-halide lighting units creating excessive heat, high electricity bills, and poor product color rendering.
Engineering Solution
Installed high-CRI (98+) track LED fixtures, programmable scene layouts, and daylight harvesting sensors.
Verified Results
Reduced lighting electricity consumption by 65%. Store footfall conversions increased due to enhanced display aesthetics.
Portfolio-wide testing, inspection, and safety certification of 240 residential apartments.
Client Challenge
Completing landlord compliance testing across occupied properties with minimal resident disturbance.
Engineering Solution
Deployed a 6-man technician team with real-time digital reporting tools, completing 8 properties per working day.
Verified Results
100% of apartments inspected and EICR certificated within 30 working days. All hazardous C2 faults repaired same-day.
Ongoing commercial maintenance contract for Heathrow area logistics hubs.
Client Challenge
Preventing unplanned equipment failure and certifying compliance for insurance frameworks.
Engineering Solution
Structured bi-annual inspection routines, thermal diagnostics, and emergency lighting system load testing.
Verified Results
Maintained 100% compliance record. Unplanned system tripping instances reduced to zero over a 24-month period.